Our Assets

State-of-the-art Oil Storage and Blending Facility in Hamriyah, Sharjah, UAE

Presence at every stage of the supply chain is an important aspect of our growth strategy

7

Storage Tanks

18,582

CBM Capacity

12m

Draft Depth

100T

Weigh Bridge

Storage Tanks

Seven state-of-the-art storage tanks with a total capacity of 18582.90 CBM

Technical Overview

Configuration

The tanks are configured to handle both clean and dirty product and have a direct connection to the outer berth with 12 meters draft and inner berth with 4 meters draft.

Flexibility

This gives flexibility to berth the vessel as per size at desired jetties for full optimization of operations.

Specifications

  • • Tank farm to handle Gas Oil, Base Oil
  • • Shell plate thickness based on product specific gravity
  • • API 650 method (1-ft method per clause API-650)

Standards

  • • 20,000 CBM of storage capacity
  • • Tanks ranging from 3400 CBM to 1900 CBM
  • • American Code of Practice

T-1

Class B

Height
20.063m
Diameter
19.996m

Storage Capacity

3639.64

Cubic Meters (CBM)

T-2

Class B

Height
20.045m
Diameter
19.993m

Storage Capacity

3631.64

Cubic Meters (CBM)

T-3

Class A

Height
20.075m
Diameter
20.010m

Storage Capacity

3639.65

Cubic Meters (CBM)

T-4

Class A

Height
20.259m
Diameter
20.030m

Storage Capacity

1900.28

Cubic Meters (CBM)

T-5

Class B

Height
20.080m
Diameter
20.024m

Storage Capacity

1910.99

Cubic Meters (CBM)

T-6

Class B

Height
20.090m
Diameter
19.932m

Storage Capacity

1957.07

Cubic Meters (CBM)

T-7

Class B

Height
20.073m
Diameter
19.995m

Storage Capacity

1903.63

Cubic Meters (CBM)

Total Storage Capacity

18582.90 CBM

Across 7 storage tanks ranging in sizes from 3400 CBM to 1900 CBM

Infrastructure & Facilities

Comprehensive infrastructure ensuring efficient operations

Ship Docks

  • Direct Pipeline connectivity with main harbour
  • Dock infrastructure capable of loading/unloading
  • Panamax/Suezmax size vessels with 12-meter draft
  • Inner berth with 4 meters draft for smaller vessels

Land Loading Spots

  • In house electronic weigh bridge of 100 MT capacity
  • 4 truck spots for simultaneous loading/unloading
  • Loading of cargoes of varied nature
  • Facility for road transport to unload oil tankers directly to the tank

Pipelines

  • Two oil product pipelines connecting to main dock
  • Two oil product pipelines from barge dock
  • Pipeline Specification: ERW Carbon still pipe ASTM A120/ASTM A53/API 5L Grade 52 PSL-2
  • All lines engineered and erected suitably for cup-pigging facility for 100% cargo displacement

Recovery

  • Maximum efficiency stripping system
  • Returns all oil in the lines to either tank or vessel
  • After oil is pumped, efficient recovery process
  • Minimizes product loss and maximizes operational efficiency

Strategic Acquisition - 2017

To enable this, Petrafos Energy acquired its first Oil Storage and Blending Facility in Hamriyah, Sharjah, UAE in 2017. This state-of-the-art facility caters to the demands of various clients and has enabled Petrafos to gain greater control over the value chain.

Located in the Hamriyah Free Zone, the Oil and Gas hub of UAE, this strategic acquisition has facilitated immense growth in business operations, revenues, volumes, and profitability.

Technical Specifications

World-class infrastructure built to international standards

Storage Capacity

  • 20,000 CBM of total storage capacity
  • 7 tanks ranging in sizes from 3400 CBM to 1900 CBM
  • Tank farm capable of handling Gas Oil and Base Oil
  • Shell plate thickness based on product specific gravity

Dock Facilities

  • Outer berth with 12 meters draft
  • Inner berth with 4 meters draft
  • Direct connection to storage tanks
  • Panamax/Suezmax vessel capability

Loading Infrastructure

  • 100 MT capacity electronic weigh bridge
  • 4 simultaneous truck loading spots
  • Road transport direct tank unloading
  • Varied cargo handling capability

Pipeline System

  • ERW Carbon steel pipe ASTM A120/ASTM A53/API 5L Grade 52 PSL-2
  • Cup-pigging facility for 100% cargo displacement
  • Dual pipelines to main dock
  • Dual pipelines from barge dock

Standards & Certifications

API 650 Compliant

ASTM Standards

American Code of Practice

1-ft Method per API-650

Interested in Our Facilities?

Learn more about how our state-of-the-art infrastructure can support your trading needs